| Day 24: This morning I was able to finally put everything back on the shelves
      in the storage area. This all had to be moved May 6th in preparation
      for the HVAC work on May 7th and the installation of the new bulkhead
      door. The electrical work for the AC was completed yesterday. That 
      allowed me to move everything back for now. | 
|   2024_05_22_-_Moving_back_into_storage_area.mp4 13.86 MB |