| Day 44: The TK Danis crew was on site today to pour the walls. The same concrete
      pumper truck used to pour the footings was brought back to pour the
      walls. I made two time lapse videos, one from each camera. I mixed in
      some sped up real time video into the clips. The two videos at the top
      are the ones I made. The videos at the end are real time videos from the
      cell phone camera that I took to document things more completely.
      Enjoy! I took some pictures of the rhododendrans that got moved last week on the June 5th. They seem to be surviving. |