| Day 128: After the long Labor Day weekend work resumed. Rich and Kevin finished
      siding the long garage wall and moved onto the back wall. They finished that
      wall and mostly finished the south wall of the sun room. The electricians
      continued inside. | 
|   2024_09_03_-_Siding_back_wall_and_sun_room-1280x720v30.mp4 326.54 MB |   siding_back_wall.jpg 706.26 KB |