| Day 155: On Sept 30th of the home renovation project the drywall 
      mudding crew sanded all the mudded surfaces.
      The level of dust created was incredible. It hung in the air like 
      fog. The crew wore respirators the whole time. I held my breath 
      when walking through the house to the outside. Cleanup took many
      hours. The dust got everywhere. |