Day 206: On Nov 20th of the home improvement project Rich and Kevin
did final painting. Cody and Rigo of ANCO Plumbing and Heating
connected faucets and drains in bathroom and kitchen. The shower fixtures
were installed and shower drain. They also ran black pipe for gas to the dryer
and the range. Cody needs to come back tomorrow to finish work on the
gas lines. Rich and Kevin moved the washer and dryer into
the laundry room and ran the dryer exhaust through the crawl
space. We're getting very close to done!
|